Usage
Optic socket isinstalled on the side of the tanker to transfer the electrostatic signal andoverflow signal between the tanker and loading platform. When do bottomloading, it should be monitored on the ground. Load monitor requires a specialsignal to provide ground verification signal. In addition, the wire should beconnected with grounding wire of vehicle identification system.
For properinstallation, “the ground wire” MUST be securelyfastened to the tanker chassis; we have pre-wired it to pin NO.9 on theoverfill-detection sockets to provide proper ground verification.
Material
Body: Aluminum
Seal: NBR
Hardware parts:Stainless steel
Pin: 6.10
Feature
1. Pre-wired,tested and ready for installation
2. AluminumHard-Coated Nose Ring and J-Slots for long wear
3. GroundWire Installed
4. VehicleIdentification wire installed
5. Stainless-steelcontact pins
6. Color-codedfor easy identification
7. Lightweight, durable, low-cost caps with raised surfaces for better grip included
8. Stainless-steelhardware included

Install the image: